Lin Lin, Orlando Rivera Letelier, Xinyu Wang, Andrés Fielbaum
Abstract
In response to growing global commitments to zero-emission public transport, this paper addresses the operational complexities of electrifying ferry systems. Electric ferries introduce unique scheduling challenges due to their high energy consumption, limited battery range, and constrained berth availability. This paper develops a mathematical model to test whether these operational challenges can make electric ferry operation infeasible. Given a ferry network and fixed line headways, this paper proposes a Mixed Integer Linear Program (MILP). The model generates vessel schedules that include line timing, berth assignment, battery charging, crew breaks, and vessel repositioning. To improve tractability over real-world networks, a terminal-timing heuristic is implemented. The objective function is a convex combination of fleet size and rebalancing time. The method is applied to two toy models and to the Sydney ferry network, generating different feasible solutions depending on the weight given to each objective, followed by a discussion on the conditions that make electrification feasible. Results from the Sydney case study suggest that electrification will be operationally challenging under the current berth configuration and realistic charging assumptions, with feasible incumbent schedules showing increased rebalancing and substantial charging-related terminal occupation. Furthermore, for the current Sydney configuration and Auckland-based charging speeds, no feasible solution was found within the computational limit; feasible schedules were obtained only in scenarios with additional infrastructure or faster charging. Overall, the MILP is shown to have sufficient flexibility to study the operational effects of ferry electrification under different scenarios.